General Inspection | 6/9/2014 | 6/9/2014 | 6/9/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/9/2014 | 6/9/2014 | 6/9/2014 | P | PASS |
Andy J. Long
|
|
|
BLD already finaled. House complete and landscaped. Just a few units remaining on Elevation Ridge, the DI filter can be removed. No violations.
|
Random Inspection | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | PART |
Andy J. Long
|
|
|
House is near completion. Verbal correction given to RP to remove the DI bag to the left of the house since it is full of dirt and lots are landscaped.
|
General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues
|
General Inspection | 2/21/2014 | 2/21/2014 | 2/21/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/21/2014 | 1/21/2014 | 1/21/2014 | | PASS |
Andy J. Long
|
|
|
Foundation was laid Fall 2013. Vertical construction is begining to resume. No corrections at this time.
|
General Inspection | 12/18/2013 | 12/18/2013 | 12/18/2013 | | PASS |
Andy J. Long
|
|
|
Work on townhome has resumed. No corrections required at this time. BMPs installed.
|
General Inspection | 11/14/2013 | 11/14/2013 | 11/14/2013 | | PASS |
Andy J. Long
|
|
|
No construction activity. Foundation for townhouse has been laid and prepped for vertical construction. BMPs are installed. No corrections at this time.
|
General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | | PASS |
Evan Jenkins
|
|
|
|
Issue & PRINT permit SFD | | | 8/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 7/23/2013 | | 7/23/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Plan waived after site evaluation per email Jan 17, 2013
|
Application received | | | 7/19/2013 | | |
|
|
|
|