General Inspection | 4/7/2014 | 4/7/2014 | 4/7/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/7/2014 | 4/7/2014 | 4/7/2014 | P | PASS |
Andy J. Long
|
|
|
House structure complete and landscaped. Construction materials and waste have been removed. No further ESC inspections required. Other townhomes under construction in Elevation Ridge so will continue to monitor.
|
General Inspection | 3/7/2014 | 3/7/2014 | 3/7/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No violations.
|
General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 | | PASS |
Andy J. Long
|
|
|
Elevation Ridge townhome construction in compliance.
|
General Inspection | 1/1/2014 | 1/1/2014 | 1/2/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
Random Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 | P | FAIL |
Andy J. Long
|
|
|
Need to sweep up sidewalks and street in front of house.
Written CN left on site. Called RP Clint Wall to educate contractors to not drive over wattles.
|
Site Preparation | 11/14/2013 | 11/14/2013 | 11/15/2013 | P | CANC |
Evan Jenkins
|
|
|
Clint Phone #: ###-#### Andy already performed this inspection on 11-6-13
|
Site Preparation | 11/6/2013 | 11/6/2013 | 11/6/2013 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 | | PASS |
Andy J. Long
|
|
|
Site is ready for construction. Permit posted, BMPs installed.
|
Issue & PRINT permit SFD | | | 10/30/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/8/2013 | | 8/9/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 7/31/2013 | | |
|
|
|
|