General Inspection | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Andy J. Long
|
|
|
House complete and landscaped. No outstanding ESC issues.
|
General Inspection | 4/16/2014 | 4/16/2014 | 4/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for 4/18
|
Fees Due Hold | 1/30/2014 | | 4/14/2014 | | DONE |
Christina Prado
|
|
|
|
General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 | | PART |
Andy J. Long
|
|
|
No current ESC violations observed, but fees due for a past re-inspection. Email sent to RP and contractor.
|
BMP Violation | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | FAIL |
Evan Jenkins
|
|
|
Wood River eyrie SFH BMP violation CORRECTION NOTICE POSTED ON BOTH LOTS. BMP violations, Inadequate BMP's, Lack of BMP Maintenance, excessive turbid discharges throughout sites
|
BMP Violation | 1/30/2014 | 1/31/2014 | 2/3/2014 | P | PART |
Evan Jenkins
|
|
|
Last inspection to ensure compliance or stop work order will be issued Clean up still needs performed 1-31-14
|
BMP Violation | 1/29/2014 | 1/30/2014 | 1/30/2014 | A | PART |
Evan Jenkins
|
|
|
Reinspection to see whether violations have been addressed, fixed and site to be cleaned up. Reinspection fee will be applied. CONTRACTOR CURRENTLY PERFORMING CLEANUP AND INSTALLING BMP'S. WILL Reinspect tomorrow 1-31-14 at 1:00pm for given deadline.
|
BMP Violation | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | FAIL |
Evan Jenkins
|
|
|
Wood river homesite Called Bobby (RP) to disclose BMP violations that occuring and to perform maintenance on existing BMP's and add additional perimeter BMP's to keep sediment from leaving the site. He stated he will do it today. Will Reinspect tomorrow to ensure violations have been addressed/fixed
|
BMP Violation | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | FAIL |
Andy J. Long
|
|
|
RP Bobby Silva to clean sidewalks from the recent blowout onto Arrow Villa.
Corrections to be made: 1. Clean up dirt/sediment on street 2. Replace affected DI bags 3. Re-install damaged wattles 4. Place permiter wattles on bare sites owned by Wood River.
Will re-inspect
|
General Inspection | 12/18/2013 | 12/18/2013 | 12/18/2013 | | PART |
Evan Jenkins
|
|
|
No Construction Sign: Left one next to front door for Todd (RP) to refill out and repost. Also, once ground defrosts, contractor will re-establish vegetation; Talked to RP via cell to disclose this info
|
General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 8/26/2013 | 8/27/2013 | 8/28/2013 | A | DONE |
Tony Young
|
|
|
bobby Phone #: ###-####
|
Issue & PRINT permit SFD | | | 8/26/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/7/2013 | | 8/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 8/5/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2013 2:55PM
|