Site Final | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Andy J. Long
|
|
|
All equipment materials and other items have been demobilized. No sediment leaving site.
Petra has turned land back to Riverstone School. No further ESC inspections needed.
|
Aging Inspection | 3/28/2016 | 3/28/2016 | 3/28/2016 | | CANC |
Evan Jenkins
|
|
|
|
Aging Inspection | 1/25/2016 | 1/25/2016 | 1/25/2016 | | PASS |
Andy J. Long
|
|
|
Final clean up and de-activation in progress. No violations observed.
|
Aging Inspection | 11/23/2015 | 11/23/2015 | 11/23/2015 | | PASS |
Andy J. Long
|
|
|
Terraces laydown yard and staging area is still in use with significantly less activity now that work is near completion on the main project. Rock entrance is in good condition and no trackout on to Lysted Street occuring. Laydown yard perimeter is self contained, no sediment or runoff leaving site.
No corrections. Project should be done before end of year.
|
Aging Inspection | 9/21/2015 | 9/21/2015 | 9/21/2015 | | PART |
Andy J. Long
|
|
|
Terraces Laydown yard still in use for employee parking, material storage, and project offices. Construction entrance is installed and is free of excess mud/dirt.
Lysted street has significant amount of loose sediment collected on both sides of street in gutters.
Correction: - Focus on sweeping along Lysted. - Check inlet bags on west side of project that no longer receive runoff from disturbed construction area. These bags may be removed since they are temporary BMPs. West side of Terraces is landscaped and stabilized along Council Springs.
|
Aging Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | PART |
Evan Jenkins
|
|
|
Silt Fence along south side needs to be repaired. No trackout observed on warmsprings
|
General Inspection | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | PASS |
Andy J. Long
|
|
|
Terraces laydown yard still in use. No trackout and stabilized rock entrance is installed. Perimeter surrounded by earthen berms, chain link fencing, and silt fence in some areas.
No corrections necessary.
|
Aging Inspection | 5/18/2015 | 5/18/2015 | 5/18/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Aging Inspection | 3/16/2015 | 3/16/2015 | 3/16/2015 | | PASS |
Andy J. Long
|
|
|
Terraces Laydown yard construction entrance, silt fence perimeter BMP, and chain link fence are installed and working effectively.
No trackout at time of inspection, no dust issues.
Approved.
|
Aging Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | | PASS |
Andy J. Long
|
|
|
No trackout or stormwater runoff originating from Terraces trackout yard. No corrections at this time.
|
Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | | PASS |
Andy J. Long
|
|
|
No trackout at entrance of Terraces laydown/staging yard. No stormwater discharges from site observed. Perimeter has chain link fencing, silt fence, and earthen berm. See ESC14-00755 for Terraces main project site.
No corrections at this time.
|
Aging Inspection | 9/10/2014 | 9/10/2014 | 9/10/2014 | | PASS |
Andy J. Long
|
|
|
Contruction entrance to Terraces laydown yard is in good shape. Perimter silt fence and security fencing is also in good condition.
Roundabout on Lysted and surrounding streets are free of significant amounts of sediment due to completion of Correction Request to sweep at the end of last week.
Approved.
|
Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Andy J. Long
|
|
|
Terraces laydown yard silt fence and fence perimeter is in good condition. The fence has trapped some lumber plastic wraps that will need to be cleaned when project is complete. No dust or trackout issues observed.
|
General Inspection | 7/1/2014 | 7/1/2014 | 7/1/2014 | | PASS |
Andy J. Long
|
|
|
No trackout from Terraces laydown yard. Rock entrance is in good condition. Stockpiles stored within silt fence perimeter. Main site also in compliance. Gutters and streets are clean, dust is not excessive at time of inspection.
|
Conference | 5/1/2014 | 5/1/2014 | 5/1/2014 | A | CANC |
Andy J. Long
|
|
|
|
Conference | 5/1/2014 | 5/1/2014 | 5/1/2014 | P | PASS |
Andy J. Long
|
|
|
Please see ESC13-00755 for details on conference regarding previous day's correction notice.
Site is now in compliance.
|
BMP Violation | 4/30/2014 | 4/30/2014 | 4/30/2014 | A | FAIL |
Andy J. Long
|
|
|
No improvements to construction entrances or any efforts to reduce track out as listed in the SWPPP/ ESC plan.
See ESC13-00755 for CN details.
|
Tracking Control | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Andy J. Long
|
|
|
Staging area looks good. Corrections issued for the main site.
|
General Inspection | 1/15/2014 | 1/15/2014 | 1/15/2014 | | PASS |
Andy J. Long
|
|
|
Construction entrance and silt fence perimeter in good condtion around laydown yard.
Will need to replenish entrance to Terraces main site next week, but is ok for now.
Note - lots of sand on round-a-bout due to ACHD winter road sanding.
|
Site Preparation | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Andy J. Long
|
|
|
jc Phone #: ###-####
Met with JC and Preston from Petra. Laydown site is to be used for stockpiling, equipment storage, and jobsite trailer. Construction entrance installed. Site has perimeter silt fencing and pre-existing man-made berms to contain runoff. Silt fence is fully trenched in. Approved for construction activity.
|
General Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 | | PASS |
Andy J. Long
|
|
|
|
Case Summary (ESC) | | | 8/29/2013 | | |
|
|
|
|
Issue & PRINT permit COM | | | 8/23/2013 | | DONE |
|
|
|
|
Application received | | | 8/7/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/7/2013 | | 8/7/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Lease agreement received. SWPPP for laydown yard apart of Terraces Grading and Drainage ESC Permit #ESC13-00755
|