General Inspection | 3/21/2014 | 3/21/2014 | 3/21/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 3/21/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Andy J. Long
|
|
|
Home is complete and yard is landscaped/stabilized. Canyon Crest homes installed BMPs on adjacent lot uphill to prevent banks from washing out to street. ESC conditions satisfied.
|
Tracking Control | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Evan Jenkins
|
|
|
Dave Wipper Phone #: ###-#### correction notice lifted
|
Tracking Control | 2/14/2014 | 2/18/2014 | 2/18/2014 | A | CANC |
Evan Jenkins
|
|
|
Dave Phone #: ###-#### Talked with Dave via cell, he stated he's going to call in to cancel the AM inspection, and reschedual for this afternoon
|
Fees Due Hold | 2/14/2014 | | 2/18/2014 | | DONE |
|
|
|
|
BMP Violation | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | PART |
Evan Jenkins
|
|
|
Stop Work Order Lifter, Correction Notice takes its place. Contractor to Continue Cleaning Up. reinstall perimeter BMP's per manufacture's spec. Continue BMP Maintenance
|
Stop Work Order | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | DONE |
Evan Jenkins
|
|
|
Schedualed Inspection to see if corrections have been made with Dave Wipper
|
Fees Due Hold | 1/30/2014 | | 2/13/2014 | | DONE |
Rita DeYoung
|
|
|
|
Conference | 2/11/2014 | 2/11/2014 | 2/11/2014 | A | PEND |
Evan Jenkins
|
|
|
stop work order violations: meeting onsite talked with RP onsite to discuss stop work order, and corrections needed to be made before order will be lifted
|
BMP Violation | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | FAIL |
Evan Jenkins
|
|
|
Canyon Crest Eyrie BMP violation STOP WORK ORDER ISSUED: Multiple BMP violations: Lack of BMP Maintenance, Inadequate BMP's, Turbid Water Discharges throughout site/s
|
BMP Violation | 1/30/2014 | 1/31/2014 | 2/3/2014 | P | PART |
Evan Jenkins
|
|
|
Last inspection to ensure compliance has been achieved or Stop Work Order issued Clean up still needs performed 1-31-14
|
BMP Violation | 1/29/2014 | 1/30/2014 | 1/30/2014 | A | PART |
Evan Jenkins
|
|
|
Reinspection to see whether violations have been addressed, fixed and site to be cleaned up. Reinspection fee will be assessed. CONTRACTOR CURRENTLY PERFORMING CLEANUP AND INSTALLING BMP'S. WILL Reinspect tomorrow 1-31-14 at 1:00pm for given deadline.
|
BMP Violation | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | FAIL |
Evan Jenkins
|
|
|
canyon crest homesite Significant sediment leaving site. Met onsite with Dave Wipple to address and discuss BMP violations. He began cleanup and will install gravel check dams throughout his multiple sites immediately. Will reinspect tomorrow. Reinspection fee will be applied
|
General Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 | | FAIL |
Andy J. Long
|
|
|
RP David Wipper to re-install perimeter BMPs that have failed, pick up trash, and sweep sidewalks. This in addition to addressing issues on Canyon Crest future homesites in Eyrie Canyon 6 & 7.
|
General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 | | PASS |
Andy J. Long
|
|
|
No corrections required at this time.
|
General Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 | | FAIL |
Evan Jenkins
|
|
|
Contacted RP David Wipper left voicemail to contact me asap. Multiple BMP violations on ever lot he has. No BMP's in the Majority of his sites. Track out and runnoff occuring on each of his sites. Install perimeter BMP's immediately, sweep sidewalk and road. Will reinspect 11-8-13 in the afternoon.
|
Site Preparation | 9/9/2013 | 9/9/2013 | 9/9/2013 | A | PART |
Tony Young
|
|
|
need another waddle
|
(F) Reprint permit | | | 9/4/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/3/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Routing - Erosion and Sediment | 8/14/2013 | | 8/15/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Does not meet EPA SWPPP requirements. Approved per redlines
|
Application received | | | 8/12/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 12 2013 12:01PM
|