Site Final | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 7/10/2014 | 7/10/2014 | 7/10/2014 | P | PART |
Andy J. Long
|
|
|
Only interior work remaining on warhouse. No violations but need to remove DI bags on corner of Cole and southern loop of Century Way.
|
General Inspection | 6/16/2014 | 6/16/2014 | 6/16/2014 | | PASS |
Andy J. Long
|
|
|
Warehouse near completion. Parking lot and drainage system is installed and complete so no mud or sediment loose on site. Approved.
|
General Inspection | 4/16/2014 | 4/16/2014 | 4/16/2014 | | PASS |
Andy J. Long
|
|
|
No trackout, dust or other violations.WIP.
|
Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Andy J. Long
|
|
|
Permits posted. Perimeter wattles in place. No trackout onto Century Way. Site grading and drainage under ESC13-00967. Entrances have been paved but more grading remains. No corrections at this time.
|
Random Inspection | 1/3/2014 | 1/3/2014 | 1/3/2014 | P | PASS |
Andy J. Long
|
|
|
Minimal track out onto Century Way. Permit is posted and perimeter wattles installed. Grading and site construction is under ESC13-00967.
Pavement on south access is installed, mitigating track out issue. North entrance access is restricted.
In compliance at this time.
|
BMP Violation | 11/27/2013 | 11/27/2013 | 11/27/2013 | P | PART |
Evan Jenkins
|
|
|
sweep track out
|
Issue & PRINT permit COM | | | 11/26/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 11/25/2013 | | 11/25/2013 | | DONE |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 10/11/2013 | | |
|
|
|
10-11-13 received 2 storm water pollution prevention plans sent to Evan J.
|
Routing - Erosion and Sediment | 10/2/2013 | | 10/2/2013 | | FAIL |
Evan Jenkins
|
|
|
|
Application received | | | 8/20/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2013 9:38AM
|