General Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 3/19/2014 | 3/19/2014 | 3/19/2014 | P | PASS |
Andy J. Long
|
|
|
Modular building has been installled. Stormwater drainage is complete, all construction materials removed and sediment swept up. ESC conditions satisfied.
|
General Inspection | 1/28/2014 | 1/28/2014 | 1/28/2014 | | PASS |
Andy J. Long
|
|
|
Modular building is on-site but has not yet been installed. No ESC violations observed. No sediment leaving site.
|
Issue & PRINT permit COM | | | 1/21/2014 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/6/2013 | | 12/6/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Need to designate RP to receive permit.
|
Application received | | | 8/21/2013 | | |
|
|
|
|