General Inspection | 12/23/2013 | 12/23/2013 | 12/23/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PASS |
Andy J. Long
|
|
|
Pool is installed and surrounding area stabilized. No further ESC inspections required.
|
General Inspection | 11/21/2013 | 11/21/2013 | 11/21/2013 | | PASS |
Andy J. Long
|
|
|
Pool is installed. Hillside has biodegradable wattle staked in. Lot has been stabilized. Can be finaled with rest of house. No corrections at this time.
|
Issue & PRINT permit SFD | | | 8/27/2013 | | DONE |
|
|
|
|
Application received | | | 8/23/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/23/2013 | | 8/23/2013 | | DONE |
Jason C. Taylor
|
|
|
|