DOC - Permit Finaled | 5/22/2014 | 5/22/2014 | 5/22/2014 | P | PASS |
Andy J. Long
|
|
|
ESC conditions satisfied. See notes.
|
Site Final | 5/22/2014 | 5/22/2014 | 5/22/2014 | P | PASS |
Andy J. Long
|
|
|
Road is complete. Banks of shoulders are now vegetated and the shoulder itself is gravel. ESC conditions satisfied.
|
General Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/16/2014 | 4/16/2014 | 4/16/2014 | | PASS |
Andy J. Long
|
|
|
Work is complete. Road shoulders in process of stabilization. May be ready for final by next inspection.
|
General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Andy J. Long
|
|
|
Road construction is finished and in use. Shoulders have been hydro-mulched, all equipment and material has been reomved from staging. Will keep ESC permit open to monitor stabilization in progress. BLD has not been finaled.
|
General Inspection | 1/24/2014 | 1/24/2014 | 1/24/2014 | | PASS |
Evan Jenkins
|
|
|
Hydromulch is holding up well. Waiting for seed to grow
|
General Inspection | 11/22/2013 | 11/22/2013 | 11/22/2013 | | PASS |
Evan Jenkins
|
|
|
Disturbed areas were recently Hydroseeded
|
Random Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Andy J. Long
|
|
|
Wattles in place and permit posted at job staging site off Joplin Road. Vegetated buffer protects Thurman Mill Canal. No cement work yet. Minimal trackout. Was on site for UV project and phosphourous project
|
Site Preparation | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | PASS |
Jim Sly
|
|
|
JIM Phone #: ###-#### Required waddles in place. Contr. wants to change location of staging area to the West side of road. Talked about lining the concrete washout with 6 mil. plastic. Sign posted......OK
|
Site Preparation | 9/6/2013 | 9/6/2013 | 9/6/2013 | A | NR |
Jim Sly
|
|
|
call 30 mins prior Jim ###-#### Need Approved plan, Final letter of approval from STRATA and fire final OK.
|
(F) Reprint permit | | | 9/6/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/5/2013 | | 9/5/2013 | | DONE |
Jason C. Taylor
|
|
|
|
Permit Ready to Issue | | | 8/30/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/30/2013 | | |
|
|
|
|
General Inspection | 12/24/2013 | 12/24/2013 | | | |
Jim Sly
|
|
|
|