General Inspection | 4/1/2014 | 4/1/2014 | 4/1/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/1/2014 | 4/1/2014 | 4/1/2014 | P | PASS |
Andy J. Long
|
|
|
Grading and utility work is complete. Parking lot has been cleaned. Some materials still on site for vertical construction project. Covered under ESC13-00939. Conditions satisfied for this permit.
|
General Inspection | 1/28/2014 | 1/28/2014 | 1/28/2014 | | PART |
Andy J. Long
|
|
|
No sediment leaving site onto Vista at time of inspection, but need to sweep up the parking lot where the utility trench was cut to prevent sediment going to street. Permit posted. No other corrections.
|
Site Preparation | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Evan Jenkins
|
|
|
Mike Phone #: ###-#### Construction Signs Posted All BMP's in Place Looks good
|
Routing - Erosion and Sediment | 10/2/2013 | | 10/2/2013 | | DONE |
Jason C. Taylor
|
|
|
|
Issue & PRINT permit COM | | | 10/2/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/13/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 13 2013 10:23AM
|