Site Final | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/7/2014 | 2/7/2014 | 2/7/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/23/2014 | 1/23/2014 | 1/23/2014 | | PASS |
Andy J. Long
|
|
|
BMPs in place, Permit posted. No work on river channel banks, existing vegetation kept in place, No corrections.
|
General Inspection | 1/3/2014 | 1/3/2014 | 1/3/2014 | | PASS |
Andy J. Long
|
|
|
Vegetative barrier between work area and river channel. No corrections at this time. Inside gated community - WIP.
|
General Inspection | 12/19/2013 | 12/19/2013 | 12/19/2013 | | PASS |
Andy J. Long
|
|
|
|
Issue & PRINT permit SFD | | | 10/1/2013 | | DONE |
|
|
|
|
Application received | | | 9/27/2013 | | PASS |
|
|
|
Will Abide by all Erosion and Sediment Constrol Requirements Prior, and throughout the completion of construction
|