Aging Inspection | 5/25/2015 | 5/25/2015 | 5/26/2015 | | PASS |
Andy J. Long
|
|
|
Home is near completion and fully landscaped. Some interior work remains so BLD still open. No ESC corrections. Will have Tahoe and Hunter remove all inlets in the completed phases of Dallas Harris Estates.
|
DOC - Permit Finaled | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Last section of Tahoe Homes on Old Hickory is in progress. No runoff from work area, spills, or loose sediment in gutter. Alley way is clean and receiving DIs have inlet protection. 2###-#### should be done soon and landscaped as a block.
|
Site Preparation | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Permit posted. Two Tahoe homes in progress on both sides. Approved for construction.
|
Aging Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Contractors parking on street. Trash is contained. No corrections needed at this time.
|
Aging Inspection | 11/11/2014 | 11/11/2014 | 11/12/2014 | | PASS |
Andy J. Long
|
|
|
Foundation not yet poured, site has been prepped for construction. Permit posted. No corrections.
|
Aging Inspection | 9/10/2014 | 9/10/2014 | 9/10/2014 | | PASS |
Andy J. Long
|
|
|
Lot currently being used for stockpile staging. No home construction started. No sediment leaving site.
|
Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | | PASS |
Andy J. Long
|
|
|
No activity yet. Lot owned by Tahoe and has stockpile on it from adajacent projects. No sediment leaving site.
|
Issue & PRINT permit SFD | | | 11/19/2013 | | DONE |
|
|
|
|
Application received | | | 10/9/2013 | | |
|
|
|
|