Site Final | 11/13/2013 | 11/13/2013 | 11/13/2013 | P | PASS |
Andy J. Long
|
|
|
Tree hole soil has been installed and leveled. Surrounding sidewalks and streets well swept. Cutting Edge provided notification that they were finished with their scope of work. ESC permit conditions have been satisfied.
|
DOC - Permit Finaled | 11/13/2013 | 11/13/2013 | 11/13/2013 | P | PASS |
Andy J. Long
|
|
|
Approved. See activity notes for site final inspection.
|
Site Final | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | NR |
Andy J. Long
|
|
|
Cutting Edge tree hole project; check that work is completed as stated by RP.
Some sweeping is around tree hole area is in progress. Will follow up tomorrow to make sure it is complete.
|
Site Preparation | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | CANC |
Andy J. Long
|
|
|
data entry error. Site final was requested
|
Conference | 10/31/2013 | 10/31/2013 | 10/31/2013 | P | PASS |
Andy J. Long
|
|
|
Met with Shayne Geib, Operations Manager at Cutting Edge to discuss scope of project along Whitewater Blvd.
Operations: 1. Screen existing stockpile onsite (per consent with Alta) 2. Place screened topsoil material in tree holes and compact . This will be done using front end loader and dump truck 3. An auxilliary stockpile will be at corner of Fairview and Whitewater for work at that end of project.
BMPs: 1. Provided construction entrance at round about where screening operation is occuring 2. Manual sweeping of any dirt on sidewalks/street 3. Level tree hole topsoil piles below curbing.
Questions call Shayne ###-####
|
Issue & PRINT permit COM | | | 10/29/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/25/2013 | | DONE |
Barbara Stitt
|
|
|
Left a voice message for Shayne Geib that permit is ready and fees due on 10-25-13 @ 8:40am//BAS
|
Routing - Erosion and Sediment | 10/24/2013 | | 10/24/2013 | | DONE |
Andy J. Long
|
|
|
|
Application received | | | 10/23/2013 | | |
|
|
|
|