General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/8/2014 | 4/8/2014 | 4/8/2014 | P | PASS |
Andy J. Long
|
|
|
Project complete. Temporary BMPs removed. ESC permit conditions satisfied.
|
General Inspection | 3/5/2014 | 3/5/2014 | 3/6/2014 | | PASS |
Evan Jenkins
|
|
|
BMP's still inplace, Construction signage posted Work In Progress No ESC Issues at time of inspection
|
General Inspection | 1/29/2014 | 1/29/2014 | 1/29/2014 | | PASS |
Andy J. Long
|
|
|
DI in front of remodel is protected. Wattles installed on slope on east side of house. Permit is posted. No corrections at this time.
|
General Inspection | 12/27/2013 | 12/27/2013 | 12/27/2013 | | PART |
Evan Jenkins
|
|
|
Construction sign posted in front yard No BMP's in Place Ground Frozen at time of inspection Called RP Aaron 4128103 left VM and described he needs to get BMP's in place asap (soon as ground defrosts) or continually sweep to ensure no sediment leaves site into ACHD ROW
|
Issue & PRINT permit SFD | | | 11/19/2013 | | DONE |
|
|
|
|
Application received | | | 11/12/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 11/12/2013 | | 11/12/2013 | | DONE |
Andy J. Long
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2013 | | DONE |
|
|
|
|
Telephone call | | | 11/12/2013 | | DONE |
Christina Prado
|
|
|
called Aaron to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 11/12/2013 | | DONE |
Christina Prado
|
|
|
|