General Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Evan Jenkins
|
|
|
ESC Conditions Satisfied
|
General Inspection | 5/21/2015 | 5/21/2015 | 5/21/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 | | PEND |
Andy J. Long
|
|
|
No issues on slope drain installment and hillside is near full stabilization. Utility or landscape work on the north (uphill) side of Starlite culdesace has been performed. Could be Idaho Power or City of Boise PW? Culdesac was swept but some loose sediment remains. Gatorguard wattle improperly installed. Trying to determine who contractor/owner is....
|
General Inspection | 4/21/2015 | 4/21/2015 | 4/21/2015 | | PASS |
Andy J. Long
|
|
|
Drainage still in progress of stabilization. Hillside wattles still installed. No rills or gullies developing.
|
General Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 | | PASS |
Andy J. Long
|
|
|
Hillside vegetation is growing well. Wattles still installed and containing sediment. Drop inlet is clean. Will soon be ready to final ESC permit.
|
General Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/18/2015 | 2/18/2015 | 2/18/2015 | | PASS |
Phil Shearer
|
|
|
|
General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 | | PASS |
Andy J. Long
|
|
|
Warm Springs Mesa new drop inlets and slope drain are activitely draining stormwater. Surrounding slopes are revegetating and still have wattles installed. Rip rap instanlled seems to be effectively dissipating the flow and prevent drainage churn out or widening.
|
General Inspection | 1/19/2015 | 1/19/2015 | 1/20/2015 | | CANC |
Andy J. Long
|
|
|
holiday
|
General Inspection | 1/2/2015 | 1/2/2015 | 1/2/2015 | | CANC |
Andy J. Long
|
|
|
inactive revegetation site (frozen with no runoff)
|
General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 | | PASS |
Andy J. Long
|
|
|
Slope still stabilizing and BMPs still installed. No activity. Site is complete, but in sensitive hillside drainage area. Reduce inspection activity until spring and during high runoff to check performance of vegetation to prevent erosion.
|
General Inspection | 12/3/2014 | 12/3/2014 | 12/3/2014 | | PASS |
Andy J. Long
|
|
|
Drainage working well. No erosion issues on the of riprap and slope drain as well as disturbed area.
|
General Inspection | 11/18/2014 | 11/18/2014 | 11/18/2014 | | CANC |
Andy J. Long
|
|
|
revegetation site currently under snow cover. no active construction at this site
|
General Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/17/2014 | 10/17/2014 | 10/17/2014 | | PASS |
Andy J. Long
|
|
|
No issues at site. Still monitoring vegetation on the steep hillside to see if extra stabilization is need for the wet season.
|
General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 | | PASS |
Andy J. Long
|
|
|
Stabilization nearly accomplished at ACHD Mesa drainage project. Straw wattles still installed. Will keep open for rainy season monitoring. No corrections at this time
|
General Inspection | 8/26/2014 | 8/26/2014 | 8/26/2014 | | PASS |
Andy J. Long
|
|
|
No acitivity. Waiting for fall rain events to see Mesa drainage channel is adequately vegetated & stabilized.
|
General Inspection | 7/25/2014 | 7/25/2014 | 7/25/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/24/2014 | 6/24/2014 | 6/24/2014 | | PASS |
Andy J. Long
|
|
|
Slope stabilization BMPs still installed and assisting with revegetation/stabilzation. All work has long since finished, but need to continue to monitor slope as it is in steep drainage area.
|
General Inspection | 5/21/2014 | 5/21/2014 | 5/21/2014 | | PASS |
Andy J. Long
|
|
|
Hillside stabilization still in progress but not yet complete. Construction is complete.
|
General Inspection | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | PASS |
Andy J. Long
|
|
|
Drainage facilities are complete (DI's, culvert, rip rap). BMPs have been effective at hillside stabilization on both sides of Starlite. Lower hillside may need additional seeding, but Spring may bring some sprouts.
|
General Inspection | 4/17/2014 | 4/17/2014 | 4/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for 4/18
|
General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 | | PASS |
Andy J. Long
|
|
|
Stabilization in progress. Wattles still installed. Erosion control mats are in good condition with grass starting to pop through. No corrections at this time.
|
General Inspection | 2/6/2014 | 2/6/2014 | 2/6/2014 | | PASS |
Andy J. Long
|
|
|
Drainage pipe has been installed and rip rap installed below. No further construction but will continue to monitor hillside BMPs that were installed adajacent to the drainage and across the culdesac.
|
Random Inspection | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PASS |
Andy J. Long
|
|
|
WIP. BMPs have been installed. DI is not yet complete, will need to sweep street once complete. No corrections at this time.
|
General Inspection | 1/2/2014 | 1/2/2014 | 1/2/2014 | | PASS |
Andy J. Long
|
|
|
ACHD on-site working. No violations observed. Will need sweep up at end of day.
|
Application received | | | 12/16/2013 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 12/16/2013 | | DONE |
|
|
|
|