Site Final | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Phil Shearer
|
|
|
|
Site Preparation | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PART |
Andy J. Long
|
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
Stockpile from adjacent lot (already in progress) needs to be hauled away before further excavation. Perimeter BMPs installed, permit is posted.
Verbal CN to clean up area around washout, build a berm to prevent stormwater intrusion, and haul unused stockpiles/designate a stockpile parcel.
|
Issue & PRINT permit SFD | | | 3/17/2014 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/17/2014 | | DONE |
|
|
|
|
Application received | | | 12/17/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 17 2013 2:54PM
|