General Inspection | 8/26/2014 | 8/26/2014 | 8/26/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 8/26/2014 | 8/26/2014 | 8/26/2014 | A | PASS |
Andy J. Long
|
|
|
Landmark Signs TI is complete. No further construction. ESC conditions satisfied.
|
Complaint Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Andy J. Long
|
|
|
Complaint called in that painters were washing out buckets next to street.
Arrived at site and no paint have flowed to street or the storm drain at corner of La Pointe and Royal. Talked to painter and stated that washout must be contained and disposed of properly.
He stated the builder owners teenage son was helping with the painting and was unaware that it was a violation. They stopped him after 1 bucket and directed him to the shop's floor drains. I double checked it was latex paint, which is permissable in the sewer system.
|
Complaint Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 | P | PART |
Andy J. Long
|
|
|
HC Company on site working. No significant trackout at time of inspection. There is a strip of dirt in parking lot that is the source of some trackout that was reported previously.
Sweeping should be daily until the strip is paved.
|
General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 | | PASS |
Andy J. Long
|
|
|
No earthwork yet, permit is posted. No violations observed.
|
Issue & PRINT permit COM | | | 3/5/2014 | | DONE |
|
|
|
|
Application received | | | 1/8/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/8/2014 | | 1/8/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan submitted and approved. Major interior TI with a small portion of exterior TI.
|