Site Final | 4/14/2014 | 4/15/2014 | 4/15/2014 | A | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | PASS |
Andy J. Long
|
|
|
Backstops and softball fields have been renovated. All construction materials removed and cleaned. ESC conditions satisfied.
|
Override - Parcel Holds | 4/14/2014 | 1/1/1900 | 4/14/2014 | | |
|
|
|
esc final
|
General Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 | | PASS |
Andy J. Long
|
|
|
Backstops have been installed. Some minor work remaining. Pavement behind backstop will be swept at end of day and when infield is regraded.
|
General Inspection | 1/30/2014 | 1/30/2014 | 1/30/2014 | | PASS |
Evan Jenkins
|
|
|
Need to come off Capitol Ave to find the project. No ESC Issues at time of inspection
|
Issue & PRINT permit COM | | | 1/23/2014 | | DONE |
|
|
|
|
Application received | | | 1/22/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/22/2014 | | 1/22/2014 | | DONE |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2014 | | DONE |
|
|
|
|