Site Final | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PASS |
Andy J. Long
|
|
|
SFH near completion. Landscaping yard and interior work ongoing. Permit posted. No violations observed.
|
General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted. No corrections needed at this time.
|
General Inspection | 1/5/2015 | 1/5/2015 | 1/5/2015 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. House is near completion, but no landscapiing or stabilization yet. No erosion or sediment runoff obseved. Streets is on an incline and curve so there is lots of winter safety sand on roadway. (not from site)
|
General Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. No sediment leaving site, wattle installed at toe of bank. Sidewalk has been recently swept. No violations observed. Sand on road is from winter safety operations
|
General Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Frame is up. Stucco applied, interior work on going. RP/GC was on site, and noted there is some housekeeping to attend to. No sediment runoff down street or trackout. Permit posted.
|
General Inspection | 11/18/2014 | 11/19/2014 | 11/19/2014 | A | PASS |
Andy J. Long
|
|
|
WIP. Sediment and materials contained on site. No discharge or sediment runoff occuring. Permit is posted.
|
General Inspection | 11/18/2014 | 11/18/2014 | 11/18/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 | | PASS |
Evan Jenkins
|
|
|
WIP No ESC Issues at this time
|
General Inspection | 10/17/2014 | 10/17/2014 | 10/17/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted. No sediment trackout to Insgnia. Wattles line areas above grade of gutter curbing. Gutter appears to be recently swept. No trash or uncontained materials observed.
|
General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 | | PASS |
Andy J. Long
|
|
|
Wattles have temporarily removed for foundation work to be performed. No sediment runoff or issues at time of inspection. When activity along sidewalk is complete, perimeter BMP or slope/bank stabilization should be implemented.
|
Site Preparation | 8/20/2014 | 8/21/2014 | 8/21/2014 | A | PASS |
Andy J. Long
|
|
|
Kelly Phone #: ###-####
RP Kelly on site. Approved to not install silt fence at top hill due to no activity or purpose, even though indicated on site map.
Washout will be on adajacent lot and is owned by Mr. Stover. After rough grading, straw wattle will be staked down at toe of slope and sidewalk. Approved for construction.
|
Issue & PRINT permit SFD | | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 2/4/2014 | | 2/4/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan submitted and approved. Hillside zone. RP and PD are valid
|
Application received | | | 1/23/2014 | | |
|
|
|
|