Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC14-00082
StatusFinaled
Name Jason Tomlinson
Site Address 8649 W OVERLAND ROAD
Project NameDutch Bros Coffee
Customer Number 
ePlanReviewNo
Description
Site construction of approximately .4 acres and the construction of a 440 sf dual drive thru coffee stand. Protect existing MS4, construction entrance. Site development and coffee kiosk building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/4/201411/4/201411/4/2014 PASS
DetailsAndy J. Long
Correction complete- gutter was swept and is now free of debris and sediment. Roadway swept and site fully stabilized.
DOC - Permit Finaled11/4/201411/4/201411/4/2014PPASS
DetailsAndy J. Long
Site Final9/18/20149/19/20149/19/2014APART
DetailsAndy J. Long
check for corrections requested. Remove coir mat on DI and shovel/sweep sediment that has been trapped.

DI filter mat remved but the dirt and sediment were left in the gutter. ESC conditions not complete. RP was alerted to sweep up and request a final inspection.
Site Final9/18/20149/18/20149/18/2014PFAIL
DetailsAndy J. Long
Corrections required to get final:

1. Remove fiber mat on MS4 drop inlet
2. Sweep/shovel the sediment that has been trapped.

Made verbal request to RP to complete, he said he would today. Will check back later.
General Inspection8/4/20148/4/20148/4/2014 PASS
DetailsEvan Jenkins
no issues at time of inspection
General Inspection6/17/20146/17/20146/17/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
Site Preparation5/2/20145/2/20145/2/2014PPASS
DetailsMike Jordan
Additional bmp has been installed.
Conference5/1/20145/1/20145/1/2014PCANC
DetailsAndy J. Long
Follow up phone call from RP Eric from Arrow construction to confirm placement of the DI protection on MS4 on Bird Street.
Site Preparation4/30/20144/30/20144/30/2014PPART
DetailsAndy J. Long
Construction entrance provided and ESC permit posted on Overland. 1 remaining BMP installation is to protect the MS4 DI on Bird Avenue in between construction entrance and Overland. Verbal CN issued to RP Eric
General Inspection4/30/20144/30/20144/30/2014 CANC
DetailsAndy J. Long
Permit Ready to Issue  4/24/2014 DONE
DetailsCandy A. Nichols
Issue & PRINT permit COM  4/24/2014 DONE
DetailsCandy A. Nichols
Routing - Erosion and Sediment2/19/2014 2/19/2014 DONE
DetailsAndy J. Long
ESC plan and narrative submitted and approved.
Application received  2/4/2014 DONE
Application submitted via PDS Online on Feb 4 2014 4:07PM