DOC - Permit Finaled | 8/18/2014 | 8/18/2014 | 8/18/2014 | P | PASS |
Andy J. Long
|
|
|
ESC permit conditions satisfied. Scope of this project (covering Penitentiary Canal) is complete. Sub development to be covered under ESC14-00788.
|
General Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | | PASS |
Andy J. Long
|
|
|
No construction activity. No violations or issues observed.
|
General Inspection | 7/25/2014 | 7/25/2014 | 7/25/2014 | | PASS |
Andy J. Long
|
|
|
No construction activity at time of inspection. Site has been cleared, canal buried, and old house moved. RP Lance stated they are working on finalizing their application for subdivision development. No corrections at this time.
|
General Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 | | PASS |
Andy J. Long
|
|
|
No activity, no corrections at this time. Waiting for next phase of Privada sub development.
|
General Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 | | PART |
Evan Jenkins
|
|
|
Construction entrance needs to be installed and perimeter controls
|
Conference | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Andy J. Long
|
|
|
Met owner/RP Lance on site to discuss new entrance work to allow for movement of a modular home. Berm was cut to make access wider. New area is contained with a wattle that is trenched and staked properly. Will be moved when trailer is moving home. Area will be landscaped or turned into an entrance with road mix. No corrections at this time.
|
General Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 | | PASS |
Andy J. Long
|
|
|
No activity or violations. Not stabilized but subdivion development is under review and should commence in near future.
|
General Inspection | 5/14/2014 | 5/14/2014 | 5/14/2014 | | PASS |
Andy J. Long
|
|
|
No activity. No corrections at this time. May need to stabilize disturbed dirt, though there does not seem to be a dust issue at this time. Will continue to monitor.
|
General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 | | PASS |
Andy J. Long
|
|
|
The area of disturbance is not stablized but not observing any sediment runoff from the site. The subdivision plans are under review so will most likely be ready to grade and grub.
|
Random Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 | A | PASS |
Andy J. Long
|
|
|
Culvert for Pennitentiary Canal has been installed. Site used an Outpak washout and contained slurry as directed. Disturbed ground is not stabilized. No significant trackout to Warm Springs. Will check to see when next phase of project is scheduled.
|
General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | | PASS |
Andy J. Long
|
|
|
No trackout to Warm Springs from site. Pipe is being installed to cover the irrigation ditch, which is currently not flowing. No corrections required.
|
Site Preparation | 2/24/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Andy J. Long
|
|
|
Privada Estates - Penn canal site prep.
Meet RP on-site. BMPs installed and discussed current phase of project. Construction will begin starting tomorrow. The construction entrance will be moved back from road due to existing asphalt. Instead of how it is on ESC plan. Approved.
|
Routing - Erosion and Sediment | 2/18/2014 | | 2/19/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid RP and PD provided.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 2/19/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/19/2014 | | DONE |
Tisha Gallop
|
|
|
called John Chandler, he asked me to call Mike Criner at Lurre Construction office. I called Mike and told him permit is ready, fee due.
|
Issue & PRINT permit COM | | | 2/19/2014 | | DONE |
|
|
|
|
Application received | | | 2/18/2014 | | |
|
|
|
|