General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Andy J. Long
|
|
|
All exterior disturbance that may have occured has been stabilized. BLD permit finaled. No ESC issues or non-stormwater discharges observed at Craig Stein Beverage.
|
General Inspection | 4/10/2014 | 4/10/2014 | 4/10/2014 | | PASS |
Andy J. Long
|
|
|
Interior TI. No exterior disturbance observed.
|
Issue & PRINT permit COM | | | 3/31/2014 | | DONE |
|
|
|
|
Application received | | | 2/19/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/19/2014 | | 2/19/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Level 3 interior TI for warehouse. RP designation required.
|