Site Final | 8/6/2014 | 8/6/2014 | 8/6/2014 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 8/6/2014 | 8/6/2014 | 8/6/2014 | P | PASS |
Phil Shearer
|
|
|
|
BMP Violation | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PART |
Andy J. Long
|
|
|
A CN was posted on Friday 4/11 in relation to the curb cutting mess and excessive trackout on streets and sidewalks.
Streets and sidewalks have been swept, and DI bag in front off house maintained.
There is still some work to do for cleanup of the curb cutting project. CN will remain posted until the cement dust and slurry mud are completely removed.
|
Site Preparation | 4/8/2014 | 4/8/2014 | 4/8/2014 | A | PART |
Andy J. Long
|
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Need to sweep sidewalk on Playwright and clean up wood debris at multiple sites. Debris and materials also need to be cleared on River Basin.
|
Issue & PRINT permit SFD | | | 3/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 2/24/2014 | | |
|
|
|
|