Aging Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | | PASS |
Andy J. Long
|
|
|
Work complete. Industrial site so no landscaping installed, but bare areas are surroundied by curbing. No loose sediment leaving. All permits finaled.
|
DOC - Permit Finaled | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | | PASS |
Andy J. Long
|
|
|
Project near complete, some construction activity observed. No corrections need, no issues at site, all sediment and materials remaining on Idaho Power site.
|
Aging Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 | | PASS |
Andy J. Long
|
|
|
Cloud seeding vehicle and equipment wash station is complete but addition site improvements are in progress. Disturbed area has some stockpiles contained within curbed area. No violations. Approved.
|
General Inspection | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PASS |
Andy J. Long
|
|
|
WIP at Idaho Power Compound. No sediment or runoff leaving site. Sheet flow around project is retained onsite in a drainage swale in an industrial yard.
No corrections necessary.
|
Aging Inspection | 2/25/2015 | 2/25/2015 | 2/25/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled.
|
Aging Inspection | 12/25/2014 | 12/25/2014 | 12/26/2014 | | PASS |
Andy J. Long
|
|
|
|
Issue & PRINT permit COM | | | 7/16/2014 | | DONE |
|
|
|
|
Application received | | | 3/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 11 2014 10:56AM
|