Aging Inspection | 2/17/2015 | 2/17/2015 | 2/20/2015 | | PASS |
Andy J. Long
|
|
|
Project complete. All permits finaled.
|
DOC - Permit Finaled | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 12/17/2014 | 12/17/2014 | 12/17/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues at this time
|
Aging Inspection | 10/17/2014 | 10/17/2014 | 10/17/2014 | | PASS |
Evan Jenkins
|
|
|
WIP Permit posted on door no esc violations observed at this time
|
Site Preparation | 5/1/2014 | 5/1/2014 | 5/1/2014 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Andy J. Long
|
|
|
Permit posted. RP Kevin has provided a washout for concrete and other liquid wastes. Approved.
|
Application received | | | 3/25/2014 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 3/25/2014 | | DONE |
Barbara Stitt
|
|
|
|