General Inspection | 3/10/2015 | 3/10/2015 | 3/10/2015 | | PASS |
Andy J. Long
|
|
|
Wings pool room addition is complete. Site has been cleaned of materials and loose sediment. Temp BMPs removed. ESC permit conditions satisfied. All other permits finaled.
|
DOC - Permit Finaled | 3/10/2015 | 3/10/2015 | 3/10/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/23/2015 | 1/23/2015 | 1/23/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/8/2014 | 12/8/2014 | 12/8/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout or discharges. Exterior shell for indoor pool complete, interior work and final site clean up remaining. No corrections at this time.
|
General Inspection | 10/21/2014 | 10/21/2014 | 10/21/2014 | | PASS |
Andy J. Long
|
|
|
Pool project is still underway. ESC permit is posted, parking lot storm drains at Wings have filter bag inserts, and there is very little remaining disturbed area at site.
No corrections.
|
General Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 | | PASS |
Evan Jenkins
|
|
|
verticle construction occuring right now. no esc issues at time of inspection
|
General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted. Parking lot DIs have protection. No trackout to Century Way. No corrections required.
|
General Inspection | 5/22/2014 | 5/22/2014 | 5/22/2014 | | PASS |
Andy J. Long
|
|
|
Site surrounded by security gate to delineate area of disturbance. Sheet flow drains to center of site. Wings Center stormdrains have protection. Permit posted.
|
Issue & PRINT permit COM | | | 5/14/2014 | | DONE |
|
|
|
|
Application received | | | 4/2/2014 | | |
|
|
|
|