Case Summary (ESC) | | | 6/1/2016 | | DONE |
|
|
|
|
General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Andy J. Long
|
|
|
Structure has been attached to the back of B&D Foods warehouse. The surrounding area is a gravel lot. No drainage structures. ESC conditions satisfied, no further consrtuction.
|
General Inspection | 5/23/2014 | 5/23/2014 | 5/23/2014 | | PASS |
Andy J. Long
|
|
|
No violations observed.
|
Issue & PRINT permit COM | | | 5/5/2014 | | DONE |
|
|
|
|
Application received | | | 4/9/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/9/2014 | | 4/9/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan wavier submitted and approved. Need to designate a valid RP for project.
|