General Inspection | 7/8/2015 | 7/8/2015 | 7/8/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Evan Jenkins
|
|
|
Project is now complete. Annex garage, HR are now complete as well as work along Idaho and 6th street. Temp BMP's have been removed. ESC Conditions Satisfied
|
General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 | | PASS |
Evan Jenkins
|
|
|
Annex Garage is complete (Both Floors), and are being parked on. Some monor work occuring along 6th St. and Main St. No ESC issues at this time
|
General Inspection | 6/8/2015 | 6/8/2015 | 6/8/2015 | | PASS |
Evan Jenkins
|
|
|
Garage WIP: No issues at this time
|
General Inspection | 5/22/2015 | 5/22/2015 | 5/22/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time. Work occuring constists of sidewalk work along 6ths st, resurfacing the 3 floor of the Annex Garage.
|
General Inspection | 5/7/2015 | 5/7/2015 | 5/7/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: 2nd and 3rd floors of the Annex Garages are currently under construction. Work along 6th street is also in progress. No ESC issues at this time.
|
General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: contractors roto-milled the existing surface from both 2nd and 3rd level annex parking lots. Contractor preparing to resurface both parking lots. no issues so far
|
BMP Violation | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | FAIL |
Evan Jenkins
|
|
|
3rd Floor Fugitive Dust Issues Contractors rotomilling/resurfacing the 3rd floor annex parking area. Substantial amount of dust leaving the site, entering Idaho St. Correction: 1.) Utilize Dust Shroud to reduce/eliminate dust that's occuring from grinding.
Contractor stated he will. Checked back in an hour, and there was no dust leaving the site.
|
General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Interior of Garages were painted over the weekend it appears. Some minor interior work occuring on the first Floor (Copy Center) and along Main St.
|
General Inspection | 3/10/2015 | 3/10/2015 | 3/10/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: along 6th st and main. No ESC issues at this time
|
General Inspection | 2/23/2015 | 2/23/2015 | 2/23/2015 | | PASS |
Evan Jenkins
|
|
|
work has begun along 6th St. and Main. No ESC issues at this time
|
General Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Interior work occuring only at time of inspection. Upgrading the Copy center currently. HR area is complete along with sidewalks along Idaho. minor work occuring along 6th st.
|
General Inspection | 1/22/2015 | 1/22/2015 | 1/22/2015 | | PASS |
Evan Jenkins
|
|
|
exterior work is mainly finished. internal work occuring now with concrete reinforced walls being poured
|
General Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues at this time
|
General Inspection | 12/23/2014 | 12/23/2014 | 12/23/2014 | | PART |
Evan Jenkins
|
|
|
Curb along Idaho St. needs to be better swept. Pavers and Tree Planters have been installed last week. Concrete washout is nearly 1/4 full. no other ESC issues at this time
|
General Inspection | 12/8/2014 | 12/8/2014 | 12/8/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: New Drop Inlet Protection has been installed. Contractor currently sweeping along Idaho St.
|
General Inspection | 11/21/2014 | 11/21/2014 | 11/21/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/6/2014 | 11/6/2014 | 11/6/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues at this time
|
General Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 | | PASS |
Evan Jenkins
|
|
|
Drop Inlet Protection located on 6th St. has been replaced. No other ESC issues at this time
|
General Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PART |
Evan Jenkins
|
|
|
Drop Inlet Protection on 6th St. Needs to be replaced. Also, during all saw cutting or concrete drilling, contractors to utilize water to reduce airborn durn during cutting. Called Bruce and left VM disclosing both issues. I have noticed on a few occassions a significant plume of concrete dust leaving construction areas.
|
General Inspection | 9/18/2014 | 9/18/2014 | 9/18/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for 9/19
|
General Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 | | PART |
Evan Jenkins
|
|
|
Some minor dust being kicked up from saw cutting. disclosed to contractor to utilize water or a shop vac to keep fugitive dust to a minimum
|
General Inspection | 8/15/2014 | 8/15/2014 | 8/15/2014 | | PASS |
Andy J. Long
|
|
|
City Hall renovation in progress. No discharge, significant sediment accumulations, or other violations observed. Drop inlets on 6th street have adequate protection. No corrections at this time.
|
General Inspection | 7/31/2014 | 7/31/2014 | 7/31/2014 | | PASS |
Evan Jenkins
|
|
|
site is swept up looking good
|
General Inspection | 7/16/2014 | 7/16/2014 | 7/16/2014 | | PASS |
Evan Jenkins
|
|
|
BMP's will need to be changed out of the Drop Inlets in a couple weeks. A worker recently swept, but will need to continue until new sidewalk is poured.
|
General Inspection | 6/27/2014 | 6/27/2014 | 6/27/2014 | | PASS |
Evan Jenkins
|
|
|
no issues at time of inspection
|
General Inspection | 6/11/2014 | 6/11/2014 | 6/11/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/23/2014 | 5/23/2014 | 5/23/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|
Site Preparation | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Evan Jenkins
|
|
|
Bruce Phone #: ###-####
|
Fees Due Hold | 4/15/2014 | | 4/29/2014 | | DONE |
Barbara Stitt
|
|
|
|
Fees Due Hold | 4/11/2014 | | 4/14/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/10/2014 | | |
|
|
|
|
Issue & PRINT permit COM | | | 4/10/2014 | | DONE |
|
|
|
|