Site Final | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Evan Jenkins
|
|
|
BK library addition. check that sod has been placed where crane was operating. Inspection requested by Ross Tucker ###-#### see final
|
DOC - Permit Finaled | 10/31/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Evan Jenkins
|
|
|
project complete
|
Site Final | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | CANC |
Andy J. Long
|
|
|
rescheduled for 10/31
|
Site Preparation | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/18/2014 | 6/18/2014 | 6/18/2014 | | PASS |
Andy J. Long
|
|
|
BK addition projects in compliance with ESC permits (tennis courts, east wing addition, and library addtion)
|
Issue & PRINT permit COM | | | 6/10/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 4/22/2014 | | 4/22/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. CM Company (GC) needs to designate a valid RP to get ESC permit.
|
Application received | | | 4/15/2014 | | |
|
|
|
|