General Inspection | 6/4/2014 | 6/4/2014 | 6/4/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/4/2014 | 6/4/2014 | 6/4/2014 | P | PASS |
Andy J. Long
|
|
|
Power pole installed and power cable trench covered. Temp BMP (DI bag) has been removed. ESC conditions satisfied.
|
Site Preparation | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | PART |
Andy J. Long
|
|
|
eldon Phone #: ###-####
Permit posted. Spoke with RP Eldon from Idaho Power, sheet flow to central private storm drain. Filter bag to be installed in central parking lot next to the west of Echelon when construction starts this afternoon.
|
Issue & PRINT permit COM | | | 4/17/2014 | | DONE |
|
|
|
|
Application received | | | 4/15/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/15/2014 | | 4/15/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid PD and RP provided.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2014 | | |
|
|
|
|
Telephone call | | | 4/15/2014 | | DONE |
Christina Prado
|
|
|
called ELdon to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 4/15/2014 | | DONE |
Christina Prado
|
|
|
|