Site Preparation | 9/17/2014 | 9/17/2014 | 9/17/2014 | A | CANC |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | PASS |
Phil Shearer
|
|
|
|
Site Final | 9/17/2014 | 9/17/2014 | 9/17/2014 | A | DONE |
Phil Shearer
|
|
|
|
General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No sediment or discharge violations. No hillside erosion areas developing. No corrections necessary at this time.
|
General Inspection | 7/17/2014 | 7/17/2014 | 7/17/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No violations observed. Permit posted, Construction entrance and staying well within limits of disturbance.
|
General Inspection | 6/13/2014 | 6/13/2014 | 6/13/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted by stabilized construction access. Silt fence installed downslope from the the home foundation. No violations observed.
|
Site Preparation | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Andy J. Long
|
|
|
Permit posted. Silt fence protecting slope below excavation area. Stabilized construction entrance provided, currently only 30 feet long and effective, but may need to be lengthened to 50 ft as listed in ESC plan. Spoke about site with RP Brian Murdoch.
|
Issue & PRINT permit SFD | | | 5/7/2014 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 5/7/2014 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/23/2014 | | 4/23/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan and site map approved. Valid RP and PD desiganted.
|
Application received | | | 4/16/2014 | | |
|
|
|
|