General Inspection | 7/14/2015 | 7/14/2015 | 7/14/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 6/12/2015 | 6/12/2015 | 6/12/2015 | | PEND |
Evan Jenkins
|
|
|
waiting for 80% re-vegetation
|
General Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/13/2015 | 5/13/2015 | 5/13/2015 | | PEND |
Evan Jenkins
|
|
|
Vegetation Near 80% re-established. No ESC issues at this time. Road is extremely rough from traffic
|
General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 | | PASS |
Evan Jenkins
|
|
|
vegetation growing slowly. still not at 80%
|
General Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 | | PASS |
Evan Jenkins
|
|
|
Vegetation is slowly growing. At approximately 60% re-vegetated. WIll close out permit once 80% is achieved
|
General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/12/2015 | 3/12/2015 | 3/12/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 2/25/2015 | 2/25/2015 | 2/25/2015 | | PASS |
Evan Jenkins
|
|
|
waiting for vegetation to establish
|
General Inspection | 2/10/2015 | 2/10/2015 | 2/10/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/26/2015 | 1/26/2015 | 1/26/2015 | | PASS |
Evan Jenkins
|
|
|
same comments as before no activity
|
General Inspection | 1/9/2015 | 1/9/2015 | 1/9/2015 | | PASS |
Evan Jenkins
|
|
|
Project complete. Vegetation still needs to be established
|
General Inspection | 12/25/2014 | 12/25/2014 | 12/26/2014 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/10/2014 | 12/10/2014 | 12/10/2014 | | PASS |
Evan Jenkins
|
|
|
waiting for re-veg of disturbed slopes
|
General Inspection | 11/25/2014 | 11/25/2014 | 11/25/2014 | | PART |
Evan Jenkins
|
|
|
No Activity Disturbed Hillsides still need stabilization practices in place
|
General Inspection | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | PART |
Evan Jenkins
|
|
|
Part. No Activity. Hillsides not yet stabilized
|
General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 10/23/2014 | 10/23/2014 | 10/23/2014 | | FAIL |
Evan Jenkins
|
|
|
Hillside slopes still have not been hydroseeded/perminately stabilized per my conversation with Shane Hopkins (RP). Erosion taking place throughout site. Shane stated he will get area taken care of imediately
|
General Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 | | PART |
Evan Jenkins
|
|
|
still awaiting for final vegetation establishment practices. Some erosion still taking place
|
General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 | | FAIL |
Evan Jenkins
|
|
|
Significant Erosion taking place on entrance road. No Stabilization practices have been applied on any disturbed slopes and erosion taking place throughout project. Contacted Shane Hopkins disclosing concerns or road washing out and lack or stabilization and no erosion control practices have occured yet.
|
General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 | | PASS |
Evan Jenkins
|
|
|
waiting for re-vegetation to occur no esc issues at this time
|
General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 | | PART |
Evan Jenkins
|
|
|
hillside erosion taking place from lack of vegetation re-establishment practices. Disturbed areas need to be hydro-seeded or tacked w/ seed
|
General Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Evan Jenkins
|
|
|
Project completed, but needs to achieve 80% re-vegetation per 8-17. Portions have been hydroseeded, but some slopes haven't
|
General Inspection | 7/17/2014 | 7/17/2014 | 7/17/2014 | | PASS |
Evan Jenkins
|
|
|
Site looks good no issues at time of inspection
|
General Inspection | 6/13/2014 | 6/13/2014 | 6/16/2014 | | PASS |
Andy J. Long
|
|
|
Work on trailhead is in progress. DI in front of project has filter protection. No corrections.
|
General Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | PASS |
Evan Jenkins
|
|
|
Brent Phone #: ###-#### construction signage posted ESC plan onsite bmp's installed looks great
|
Issue & PRINT permit COM | | | 4/25/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/21/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 21 2014 11:15AM
|