General Inspection | 8/21/2014 | 8/21/2014 | 8/21/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Andy J. Long
|
|
|
Renovation of Parkcenter Mall for Sage school is complete. New parking lot surface and stormwater facilities are complete. Open areas are landscaped. Temp BMPs have been removed.
BLD permit still open for an interior issue; ESC conditions satisfied.
|
General Inspection | 8/6/2014 | 8/6/2014 | 8/6/2014 | | PASS |
Evan Jenkins
|
|
|
work in progress. no esc issues at this time
|
General Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | | PASS |
Andy J. Long
|
|
|
Work is ongoing for Sage Internationanl parking lot rehab and Parkcenter widening for bus turn lane.
No trackout to Parkcenter, observed use of constructed lined washout by concrete truck. No dust visible at time of inspection.
No corrections at this time.
|
Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Andy J. Long
|
|
|
No trackout to Parkcenter observed. No dust issues at time of inspection. Site has valid permit and BMPs installed.
|
Complaint Inspection | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PART |
Andy J. Long
|
|
|
Received complaint about lack of BMPs at Sage Elementary project on 6/25.
Walked site with RP Rob from Guho Corp. Checked all parking lot DIs and the MS4 DI on Parkcenter. 1. All bags had filter bag inlet protection. 2. Wattles are on-site to put around stockpiles, no stockpiles at time. 3. Area of disturbance where bank was demolished has 1.5-2 inch curbing above level of dirt, very little leaving area. 4. Water tank on site to control dust in bank area if necessary. 5. No concrete work yet but Rob said he would use a portable pan washout.
1 correction:
Clearly post permit sign and SWPPP
Other than that the site look good. No trackout to Parkcenter, no dewatering taking place. Approved.
|
General Inspection | 6/18/2014 | 6/18/2014 | 6/18/2014 | | PART |
Evan Jenkins
|
|
|
Some minimal trackout occuring. Tree's being removed/debris. Nothing major at this time of inspection. WIll keep a close eye on it
|
General Inspection | 5/30/2014 | 5/30/2014 | 5/30/2014 | | PASS |
Andy J. Long
|
|
|
|
Issue & PRINT permit COM | | | 5/13/2014 | | DONE |
|
|
|
|
Application received | | | 4/22/2014 | | |
|
|
|
|