General Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | | PASS |
Andy J. Long
|
|
|
Warehouse addition project is complete & BLD is finaled. Site cleaned of construction materials, no loose sediment or unstabilized area. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/26/2014 | 11/26/2014 | 12/1/2014 | | PASS |
Andy J. Long
|
|
|
Initial site prep work is starting to begin at TV Steel. Permit is posted on gate, perimeter wattles are installed, and no trackout to Supply Way. Approved.
|
General Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 | | PASS |
Andy J. Long
|
|
|
No ground disturbance yet. BMPs installed. Permit posted. No corrections required.
|
Site Preparation | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PASS |
Andy J. Long
|
|
|
Steve Phone #: ###-####
RP Steve on site for walk through inspection. BMPs installed include silt fence perimeter trenched in, desiganted construction entrance, roadside wattles, concrete washout pan, and permit is posted.
Treasure Valley steel site is ready for construction.
|
General Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 | | PASS |
Andy J. Long
|
|
|
No construction activity at site. Project not yet started.
|
Issue & PRINT permit COM | | | 8/6/2014 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/25/2014 | | 6/25/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan approved.
|
Application received | | | 4/26/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 26 2014 7:06PM
|