General Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 | | PASS |
Andy J. Long
|
|
|
Construction complete and BLD finaled. Storage structure is up and pavement in place. Stockpile from work has been placed in adjacent material storage yard for futrure use. Stored in safe area (gravel lot) with no MS4 or surface water in vicinity.
|
DOC - Permit Finaled | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2014 | 8/22/2014 | 8/22/2014 | | PASS |
Andy J. Long
|
|
|
New covered storage structure is in progress. Water truck on site for dust control and compaction purposes. No MS4 or surface water in vicinity. Permit posted on fence. No corrections required.
|
Site Preparation | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Evan Jenkins
|
|
|
Rush Phone #: ###-#### Adress is actually 5202: Up off Federal Way/Apple Permit Posted on Chainlink Fence. 2 sand and grease traps protected no ESC Issues
|
General Inspection | 6/19/2014 | 6/19/2014 | 6/19/2014 | | NR |
Evan Jenkins
|
|
|
Talked with Russ (RP) he stated he will not be ready to start work for another 2 weeks. He stated he will contacts ESC group when he is ready to start
|
Issue & PRINT permit COM | | | 6/2/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 4/28/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2014 11:19AM
|