General Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | | PASS |
Andy J. Long
|
|
|
Greenhouse within Simplot Plant Science grounds is complete with all permits finaled. There are two other concurrent projects at site with seperate permits. See also ESC14-00746-747.
|
DOC - Permit Finaled | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 | | PASS |
Andy J. Long
|
|
|
Simplot Plant Science building project is in progress. Permit posted at Gage and Phillipi at construction entrance. No trackout or sediment runoff observed from site. No corrections needed.
|
General Inspection | 11/27/2014 | 11/27/2014 | 11/28/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 10/27/2014 | 10/27/2014 | 10/27/2014 | | PART |
Andy J. Long
|
|
|
Work and area of disturbance is at the southern end of the Simplot Plant Research complex. Permit is posted at gate off of Phillipi.
Site does not have a rock construction entrance so there is some minor trackout to Phillipi. Stabilization and paving of the public bike path should occur soon; in the meanwhile Phillipi should be swept periodically.
No other violations observed.
|
DOC - Permit Finaled | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Andy J. Long
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
General Inspection | 9/24/2014 | 9/24/2014 | 9/24/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted, silt fence perimeter is keeping sediment off of the Phillipi bike path. The recent roadwork on Phillipi has left some sediment in area that is not related to this project.
Approved.
|
General Inspection | 8/22/2014 | 8/22/2014 | 8/22/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Phillipi is under construction so is currently dirt. Minimal trackout to Irving. No other violations observed. Work is contained well with the Simplot Plant Science complex.
|
General Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | | PASS |
Andy J. Long
|
|
|
|
Issue & PRINT permit COM | | | 7/14/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 5/6/2014 | | 5/6/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and site map submitted and approved. Valid PD provided, certified RP needs to be designated.
|
Application received | | | 5/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2014 4:04PM
|