Aging Inspection | 5/18/2015 | 5/18/2015 | 5/19/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete. Job trailer removed as well as temp BMPs. ESC permit conditions satisfied. Building is in use; BLD is temp. occupancy.
|
DOC - Permit Finaled | 5/19/2015 | 5/19/2015 | 5/19/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 3/16/2015 | 3/16/2015 | 3/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 | | PASS |
Evan Jenkins
|
|
|
|
BMP Violation | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | PASS |
Andy J. Long
|
|
|
Follow up inspection:
concrete cutting slurry mud and dust have been cleaned up per CN posted Wednesday 10/7. No new corrections required at this time.
|
Complaint Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 | P | FAIL |
Andy J. Long
|
|
|
Concrete cutting slurry was left in gutter and has gone down approximately 100 ft.
Called with verbal correction to clean to RP. Posted written correction notice at site.
|
General Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 | | PASS |
Evan Jenkins
|
|
|
WIP no esc issues at this time
|
General Inspection | 7/30/2014 | 7/30/2014 | 7/30/2014 | | PASS |
Andy J. Long
|
|
|
Interior demolition in progress. Staging area is in parking lot to the east of building. There is ACHD work also occuring in the alley behind building to install permeable asphalt for LID stormwater management.
No violations observed.
|
General Inspection | 5/30/2014 | 5/30/2014 | 5/30/2014 | | PASS |
Evan Jenkins
|
|
|
|
Issue & PRINT permit COM | | | 5/14/2014 | | DONE |
|
|
|
|
Application received | | | 5/6/2014 | | |
|
|
|
|