General Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | | PASS |
Andy J. Long
|
|
|
Project complete. New bus lane and drop area is constructed as well as the oil and sand trap for stormwater treatment. Materials removed and parking area swept clean. Approved.
|
DOC - Permit Finaled | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/19/2015 | 1/19/2015 | 1/20/2015 | | PASS |
Evan Jenkins
|
|
|
Inspection was performed at 4:05pm. Issues with Computer/Inspector Module. No ESC issues at this time
|
General Inspection | 11/19/2014 | 11/19/2014 | 11/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/17/2014 | 9/18/2014 | 9/18/2014 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 9/17/2014 | 9/17/2014 | 9/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled to 9/18 due to ESC conference
|
General Inspection | 7/18/2014 | 7/18/2014 | 7/18/2014 | | PASS |
Evan Jenkins
|
|
|
very minimal trackout drop inlets protected
|
Issue & PRINT permit COM | | | 6/23/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 5/14/2014 | | 5/14/2014 | | DONE |
Andy J. Long
|
|
|
ESC site map and narrative provided by PD. Need to designate RP to get permit.
|
Application received | | | 5/7/2014 | | |
|
|
|
|