General Inspection | 10/20/2015 | 10/20/2015 | 10/20/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete and site has been cleaned. Building tenant will remove temporary wattle once they've installed landscaping. No further ESC inspections needed.
|
DOC - Permit Finaled | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/4/2015 | 9/4/2015 | 9/4/2015 | | PEND |
Evan Jenkins
|
|
|
temp bmp removal
|
General Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | PEND |
Evan Jenkins
|
|
|
Remove witches hat from drop inlet. Remove straw waddles prior to permit being finaled.
|
General Inspection | 6/2/2015 | 6/2/2015 | 6/2/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time
|
General Inspection | 1/13/2015 | 1/13/2015 | 1/13/2015 | | PASS |
Andy J. Long
|
|
|
WIP on Rocky Mtn. Packaging expansion. Wattles protect stormwater swale and form sediment containment perimeter. Contractors parking on pavement to prevent traciout. Permit clearly posted. No corrections necessary.
|
General Inspection | 11/26/2014 | 11/26/2014 | 12/1/2014 | | PASS |
Andy J. Long
|
|
|
WIP on warehouse packaging center expansion. BMPs are installed and include perimeter wattles, concrete washout, and permit signage. No trackout or sediment discharges offsite. No corrections needed at this time.
|
Site Preparation | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | PASS |
Andy J. Long
|
|
|
Don Phone #: ###-####
RP onsite with ESC plan and site map. BMPs installed per plan including inlet protection on the private onsite storm drains, straw wattle protection for the swale to the northeast of new building area.
Parking lot and staging area is mostly paved son no construction entrance/tracking pad. No MS4 in vicinity. Permit is posted on fence west of main building.
Approved for construction.
|
Issue & PRINT permit COM | | | 9/30/2014 | | DONE |
|
|
|
|
Application received | | | 5/14/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2014 9:21AM
|