Site Final | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PASS |
Andy J. Long
|
|
|
Home construction is complete. Yard is landscaped and streets, sidewalk, and gutter have been cleaned. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | PASS |
Andy J. Long
|
|
|
Grant Phone #: ###-####
Site prep already conducted on 9/9. Two adjacent lots, one is being framed and the other lot is soon to be excavated.
No corrections or issues at time of inspection, just need to continue regular housekeeping.
|
Site Preparation | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Andy J. Long
|
|
|
Grant Phone #: ###-####
RP onsite. Permit posted. Low risk; main BMP will be daily housekeeping and waste management. Approved.
|
(F) Reprint permit | | | 9/8/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit SFD | | | 9/5/2014 | | DONE |
|
|
|
|
Application received | | | 5/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2014 11:30AM
|