DOC - Permit Finaled | 5/7/2015 | 5/7/2015 | 5/7/2015 | P | PASS |
Andy J. Long
|
|
|
Debris and materials that were temporarily dumped across the street have been remove and lot has been graded. Gutter and sidewalk also swept.
ESC conditions satisfied. Permit finaled.
|
General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/15/2015 | 4/15/2015 | 4/15/2015 | | FAIL |
Andy J. Long
|
|
|
Concrete saw cutting or washout slurry was rinsed down gutter on Clubview and sealed up the full inlet bag.
Corrections:
Sweep up residue.
Shovel out and remove full drop inlet on Clubview.
|
General Inspection | 3/31/2015 | 3/31/2015 | 3/31/2015 | | PEND |
Andy J. Long
|
|
|
Home is complete and landscaped.
DI bag in nearest inlet is installed and full of sand and mud.
Some of the accumulation can be attributed to winter road sand and other sources, but some of it is from site.
Will check in with Shadow Mtn. and also ACHD ESC inspector to look into maintenance.
|
Site Final | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PEND |
Andy J. Long
|
|
|
Landscaping and yard stabilization is near completion. Called Shadow Mtn. homes supervisor Scott to have crew remove the DI bag downhill from site on Clubview and shovel/remove the dirt/sand that was trapped.
He said he will get it done this week. Will check back when in area.
No issues or violations. Just need to remove temporary BMPs.
|
General Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no sediment leaving the construction site no violations at this time
|
General Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 | | PASS |
Evan Jenkins
|
|
|
Minor rilling had occured during the last rain event. Contractor currenlty working on addressing it. No sediment has left the site. no issues at this time
|
General Inspection | 1/28/2015 | 1/28/2015 | 1/28/2015 | | PASS |
Andy J. Long
|
|
|
Wattle trenched in along edge of paved sidewalk is doing well to keep sediment on site. No trackout. No corrections need at this time.
|
General Inspection | 1/13/2015 | 1/13/2015 | 1/13/2015 | | PASS |
Andy J. Long
|
|
|
WIP on home, yard, and rock placements. No discharges or sediment runoff. No violations observed.
|
General Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 | | PASS |
Andy J. Long
|
|
|
No hillside erosion issues, no sediment runoff in gutters. Down hill storm drain has DI protection and perimeter wattles installed along sidewalk at toe of slope in front of home.
WIP. Permit posted. Approved
|
General Inspection | 12/11/2014 | 12/11/2014 | 12/11/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/26/2014 | 11/26/2014 | 12/1/2014 | | PASS |
Evan Jenkins
|
|
|
Mainly work being performed inside at time of inspection. Exterior needs to have stabilization practices applied for perminant stabilization. no ESC issues observed at this time
|
General Inspection | 11/11/2014 | 11/11/2014 | 11/12/2014 | | PASS |
Andy J. Long
|
|
|
BMPs including perimeter wattles, DI protection, and designated staging and trash container area are in good condition. No trackout or sediment runoff occuring. WIP on home and retaining wall.
|
General Inspection | 10/24/2014 | 10/24/2014 | 10/24/2014 | | PASS |
Andy J. Long
|
|
|
Work occuring on home only - not the pool & retaining wall with the SWO. No ESC violations at site. Permit posted and BMPs installed.
|
General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 | | PASS |
Evan Jenkins
|
|
|
no issues at this time
|
General Inspection | 8/13/2014 | 8/13/2014 | 8/13/2014 | | PASS |
Evan Jenkins
|
|
|
vertical construction occuring no ESC issues observed
|
Site Preparation | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | PASS |
Andy J. Long
|
|
|
Scott Johnson Phone #: ###-####
BMPs set up per ESC plan. Wattles are installed on edge of flat parcel and slope and are properly trenched in. Two gravel bag check dams have been placed in gutter downstream on Clubview in addition to a DI filter bag on the receiving inlet. BMPs set up by Specialty Construction which also provided an Out-Pak washout box. Approved for excavation.
|
Permit Ready to Issue | | | 7/1/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit SFD | | | 7/1/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - Erosion and Sediment | 5/29/2014 | | 5/29/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid RP and PD provided for project.
|
Application received | | | 5/15/2014 | | |
|
|
|
|