General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 | | PASS |
Andy J. Long
|
|
|
Smoking shelter structure at Albertson's HQ is complete and surrounding area and asphalt stabilized. No further ESC inspections required.
|
DOC - Permit Finaled | 9/16/2014 | 9/16/2014 | 9/16/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Evan Jenkins
|
|
|
unable to determine if smoking shelter has already been existing or another will be built. attempted to call RP and Albertsons and left vm's inquiring whether the existing shelter is the one that was just constructed. still haven't heard back
|
Permit Ready to Issue | | | 7/2/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit COM | | | 7/2/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 7/2/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - Erosion and Sediment | 6/30/2014 | | 6/30/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved.
|
Application received | | | 5/21/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2014 11:33AM
|