General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 | | PASS |
Andy J. Long
|
|
|
Yard and slopes have now been stabilized with a hydroseed mulch. Coverage looks very good, no sediment leaving site and no evidence of erosion rills developing. No further ESC inspection, conditions satisfied.
|
DOC - Permit Finaled | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/14/2015 | 10/14/2015 | 10/14/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | | PEND |
Andy J. Long
|
|
|
Home complete but yard not stabilized or landscaped to completion. Hillside bond by PW has be obtained and is in effect till Oct. 26. Homeowner stated they are meeting with landscape architects this week to finalize plans and is also monitoring runoff from his property to make sure it is not cause erosion/sediment runoff. No issues observed.
|
General Inspection | 8/28/2015 | 8/28/2015 | 8/28/2015 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/13/2015 | 7/13/2015 | 7/13/2015 | | PEND |
Evan Jenkins
|
|
|
Pending Perm Vegetation re-establishment
|
General Inspection | 6/26/2015 | 6/26/2015 | 6/26/2015 | | PEND |
Evan Jenkins
|
|
|
Waiting for perm re-vegetation to become established. No ESC issues at this time
|
General Inspection | 6/11/2015 | 6/11/2015 | 6/11/2015 | | PASS |
Evan Jenkins
|
|
|
No Issues at this time
|
General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 | | PASS |
Andy J. Long
|
|
|
Home complete and is to be landscaped/stabilized by homeowner. Homeowner has bond for site revegetation. No sediment leaving site or running down gutter. DI bag on Villa Norte and Highland View is still installed and should be removed upon stabilization.
|
General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/27/2015 | 4/27/2015 | 4/27/2015 | | PASS |
Evan Jenkins
|
|
|
Home is complete and occupied. Disturbed areas have been prepped for landscaping/final stabilization. No ESC issues at this time
|
General Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: BMP's still in place, permit still posted. No discharges leaving the stie
|
General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Interior only at time of inspection. Permit and BMP's still in place. No discharges have occured
|
General Inspection | 3/10/2015 | 3/10/2015 | 3/10/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no discharges leaving the site. BMP's in place
|
General Inspection | 2/23/2015 | 2/23/2015 | 2/23/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time
|
General Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Wattle installed to keep dirt from unpaved driveway and small stockpile at end of street. No discharges or breaches observed.
Note - there is a lot of sand on Villa Norte from winter road safety measures (very steep street)
|
General Inspection | 1/22/2015 | 1/22/2015 | 1/22/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout or sediment eroding off site. Lots of sand in road from winter safety precautions. No violations observed.
|
General Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 | | PASS |
Evan Jenkins
|
|
|
BMP's in place. Interior work only occuring at time of inspection. No ESC Issues
|
General Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | | PASS |
Andy J. Long
|
|
|
MInor activity occuring on the interior at time of inspection. No sediment or turbid runoff during observed during the rain. Permit is posted, no trackout from vehicles, no trash or litter uncontained.
Approved.
|
General Inspection | 12/3/2014 | 12/3/2014 | 12/3/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues at this time. permit and bmp's still in place
|
General Inspection | 11/14/2014 | 11/18/2014 | 11/18/2014 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled.
|
General Inspection | 10/30/2014 | 10/30/2014 | 10/30/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. Wattle containing sediment onsite, no runoff or trackout onto Villa Norte. WIP. No corrections at this time.
|
General Inspection | 9/12/2014 | 9/12/2014 | 9/12/2014 | | PASS |
Evan Jenkins
|
|
|
work in progress no esc issues at this time
|
Site Preparation | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Evan Jenkins
|
|
|
Phone #: 8674587 >> Inspection requested via mobile web by Scott Flynn Construction signage posted straw waddles in place along frontage of parcel/project. Drop inlet also protected. pass
|
Issue & PRINT permit SFD | | | 7/11/2014 | | DONE |
|
|
|
|
Application received | | | 5/23/2014 | | |
|
|
|
|