Site Final | 9/5/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Andy J. Long
|
|
|
Work at Idaho Power station yard is complete. No trackout or ESC issues at site. Permit finaled.
|
DOC - Permit Finaled | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Andy J. Long
|
|
|
Call me 30 minutes before you arrive. There is no access to the site without an escort. Eldon Oyadomari, Idaho Power Phone #: ###-#### >> Inspection requested via web by Eldon Oyadomari
Construction is within gravel utilitiy yard. No surface water, no drainage structures in area of work or on Amity. Low risk. Idaho Power will schedule a Site Final when project is complete. Approved for construction.
|
Issue & PRINT permit COM | | | 6/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 5/28/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/28/2014 | | DONE |
Tisha Gallop
|
|
|
called Eldon and told him permit is ready and fee due.
|
Application received | | | 5/27/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/27/2014 | | 5/27/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver and description of project provided. Valid RP designated. Approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2014 | | DONE |
|
|
|
|