Aging Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | | PASS |
Andy J. Long
|
|
|
Construction at OrePac covered under ESC14-00526. No ESC violations at site. No further ESC inspections on this permit. Conditions satisfied.
|
DOC - Permit Finaled | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/12/2014 | 11/12/2014 | 11/12/2014 | | PASS |
Andy J. Long
|
|
|
Ore-Pac warehouse addition in progress. Area of disturbance is at rear of existing building and sediment in that area is contained by a concrete block retaining wall. Permit/SWPPP located at entrance. DI on Federal has protection. Approved.
|
General Inspection | 9/12/2014 | 9/12/2014 | 9/12/2014 | | PASS |
Andy J. Long
|
|
|
Lean-to at Ore Pac is complete. Some minor construction remaining. No violations observed.
|
Issue & PRINT permit COM | | | 7/8/2014 | | DONE |
|
|
|
|
Site Preparation | 7/1/2014 | 7/7/2014 | 7/7/2014 | A | PASS |
Andy J. Long
|
|
|
Jason from Syman requested site prep ####-####
DIs on Federal Way and OrePac parking lot have filter bag protection. Wattle protects end of sediment trap/drainage ditch on southeast end of property. Permit is to be picked up within next few days and construction commencing at that time. Approved.
|
Application received | | | 5/27/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/27/2014 | | 5/27/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Need to designate valid RP or Interim RP.
|