Site Final | 11/25/2014 | 11/28/2014 | 11/28/2014 | A | PASS |
Evan Jenkins
|
|
|
Holly Phone #: ###-####
|
DOC - Permit Finaled | 11/28/2014 | 11/28/2014 | 11/28/2014 | P | PASS |
Evan Jenkins
|
|
|
revegetated no esc issues
|
Site Final | 11/18/2014 | 11/18/2014 | 11/18/2014 | P | CANC |
Evan Jenkins
|
|
|
please call. not sure if can be done with snow// holly Phone #: ###-#### Due to snow cover, unable to visually see if area of discturbance has been re-stabilized. Contacted Holly and disclosed this information to her, and also for her to request a site final once the snow melts. she stated she will
|
General Inspection | 11/12/2014 | 11/12/2014 | 11/12/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues at this time
|
General Inspection | 10/28/2014 | 10/28/2014 | 10/28/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Evan Jenkins
|
|
|
no esc issues at this time. General Inspection
|
General Inspection | 9/17/2014 | 9/18/2014 | 9/18/2014 | P | CANC |
Andy J. Long
|
|
|
9/19
|
General Inspection | 9/17/2014 | 9/17/2014 | 9/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled to 9/19 due to ESC conference
|
General Inspection | 8/8/2014 | 8/8/2014 | 8/8/2014 | | PASS |
Evan Jenkins
|
|
|
|
Issue & PRINT permit SFD | | | 6/4/2014 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/2/2014 | | 6/3/2014 | | DONE |
Evan Jenkins
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2014 | | |
|
|
|
|
Telephone call | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
called Aaron to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 6/3/2014 | | DONE |
|
|
|
|
Application received | | | 5/30/2014 | | |
|
|
|
|