DOC - Permit Finaled | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Andy J. Long
|
|
|
Demolition phase of old bus terminal is complete for Sherwood Apartments. No work has begun on footing and foundation. See ESC14-00239 for inspection activities for project.
|
Random Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Andy J. Long
|
|
|
Site has good construction entrance, all DI's protected, and permit posted. Security fence installed and wattles at southwest corner.
|
Site Preparation | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Andy J. Long
|
|
|
Discussed site with Tony from McAlvain who is overseeing project in cooperation with Ideal Demolition. This permit is for the demolition only, the rest is under ESC14-00239
Construction entrance will be re-used asphalt chunks and located off of La Pointe Steet instead of Sherwood. The existing asphalt is to be peeled back from curbing making a trench that will trap sediment for the entire perimeter. Placement of wattles as in ESC plan is not practical for this phase. Drop inlets surrounding site have filter protection.
Approved.
|
Issue & PRINT permit COM | | | 6/4/2014 | | DONE |
|
|
|
|
Application received | | | 6/2/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/2/2014 | | 6/2/2014 | | DONE |
Evan Jenkins
|
|
|
|