Aging Inspection | 12/5/2014 | 12/5/2014 | 12/5/2014 | | PASS |
Andy J. Long
|
|
|
Eco-art sculpture has been relocated from 8th & and Main to 8th and Front. Both areas have been stabilized. The Main street location is now part of of the City Center construction site/pedestrian pathway.
|
DOC - Permit Finaled | 12/5/2014 | 12/5/2014 | 12/5/2014 | P | PASS |
Andy J. Long
|
|
|
|
Issue & PRINT permit COM | | | 6/9/2014 | | DONE |
|
|
|
|
Application received | | | 6/2/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/2/2014 | | 6/2/2014 | | DONE |
Evan Jenkins
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2014 | | |
|
|
|
|
Telephone call | | | 6/2/2014 | | DONE |
Christina Prado
|
|
|
called Swaine to advise permit is ready for pick up
|
Permit Ready to Issue | | | 6/2/2014 | | DONE |
Christina Prado
|
|
|
|