General Inspection | 10/29/2014 | 10/29/2014 | 10/29/2014 | | PASS |
Andy J. Long
|
|
|
Demolition complete and lot prepared for new construction. Graded in a way to direct sheet flow to center of lot. No sediment leaving site; no debris left behind. ESC permit finaled.
|
DOC - Permit Finaled | 10/29/2014 | 10/29/2014 | 10/29/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/18/2014 | 9/18/2014 | 9/18/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Stormwater sheet flow is directed inward to site. No MS4 facilities in area. Permit posted on back fence. Approved.
|
Application received | | | 6/4/2014 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 6/4/2014 | | DONE |
|
|
|
|