General Inspection | 3/18/2015 | 3/18/2015 | 3/18/2015 | | PASS |
Andy J. Long
|
|
|
Building #2 at Beverly project is complete. All permits finaled. No further inspections on this permit. Remaining work on building #1 and area landscaping is covered under ESC14-00529
|
DOC - Permit Finaled | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/3/2015 | 3/3/2015 | 3/3/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior of warehouse. No trackout, discharges, or other issues. Storm drains on Beverly have inlet protection. Irrigation ditch is through and adjacent to site is not flowing.
|
General Inspection | 2/13/2015 | 2/13/2015 | 2/13/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/14/2015 | 1/14/2015 | 1/14/2015 | | CANC |
Evan Jenkins
|
|
|
WIP: no esc issues at this time
|
General Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 | | PASS |
Andy J. Long
|
|
|
Limited activity today, no trackout detected. Warehouse frames are up and most of parking lot is paved. All utilities installed, irrigation/drainage ditch has some puddles but no flow. No corrections required.
|
General Inspection | 12/12/2014 | 12/12/2014 | 12/12/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Parking lot has been paved, new storm drains have inlet protection installed. Some trackout to Beverly, but no MS4 system or conveyance from site. Trash is contained, no wind blown litter issues.
No correcitons at this time.
|
General Inspection | 11/27/2014 | 11/27/2014 | 11/28/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 | | PASS |
Evan Jenkins
|
|
|
WIP sweeping occured earlier this morning. no esc violations at this time
|
General Inspection | 10/2/2014 | 10/2/2014 | 10/2/2014 | | PASS |
Andy J. Long
|
|
|
ESI project with 3 buildings on one large parcel off Victory is in progress with foundations just starting to be poured.
RP/Project Super Kevin is onsite with SWPPP. SWPPP site map has been updated with new inlet protection on Victory for offsite utility/water work to connect the site.
New heavy grade rock provided for entrance is keeping trackout in control. Irrigation drain work is complete and culverts installed. No flow at time of inspection.
Permit posted. Approved.
|
Issue & PRINT permit COM | | | 9/24/2014 | | DONE |
|
|
|
|
Application received | | | 6/16/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 16 2014 1:11PM
|